Project Name: Warham Road

  
Project Reference Number: SOE15617
Project Network: SGN

Scheme background: This document summarises planned utility works associated with the Beddington–Addington Major Capital Programme, delivered by UK Power Networks (UKPN) in coordination with SGN.
The works are located along Warham Road through to Brighton Road and Nottingham Road in Croydon, forming part of a strategic upgrade to local gas and electricity infrastructure.
Key Details
Project Reference: SOE15617
Activity Type: Utility maintenance and major connection works
Works Location: Warham Road corridor to Brighton Road / Nottingham Road
Traffic Management: Two-way temporary traffic signals (highest category)
Programme
Overall Permit Period:
29 January 2026 – 24 March 2026
Main Construction Phase:
23 February 2026 – 24 March 2026
Duration
Approximately 22–37 days
Programme Efficiency:
A revised work section achieved a 10-day programme saving
Scope of Works
Gas Infrastructure (SGN)

  • Installation of 240m of 125mm PE gas main
  • Abandonment of 240m of 6" cast iron main

Electricity Infrastructure (UKPN)

  • Installation of new high-voltage electricity supply
  • Excavation and installation of HV cable ducts
  • Major connection works supporting network reinforcement

Traffic & Public Impact
Due to the scale and coordination of works:
Two-way signal control will be in place throughout key phases
Delays and congestion are expected along Warham Road
Temporary disruption will affect local traffic and journey times
The coordinated delivery between utilities is designed to minimise repeated roadworks and reduce overall disruption.

Conclusion
This scheme represents a significant infrastructure investment in Croydon, improving the reliability and capacity of both gas and electricity networks.

While short-term disruption is unavoidable, the coordinated approach by UK Power Networks and SGN ensures efficient delivery and long-term benefits to the local area.

Key stakeholders included:

  • Greater London Authority (GLA)
  • SGN
  • UKPN
  • WCB Utilities
  • OCU GROUP
  • Croydon Council
  • Local businesses
Collaboration Partner(s):
SGN and UKPN
Project Start Date:
23 February 2026
Length of Collaboration (Meters):
240m
Estimated Days Saved:
10
 
Local Authority:
London Borough of Hammersmith & Fulham
Project End Date:
24 March 2026
Level of Collaboration:
Level 2
Project Status:
Complete